AT&T DEFINITY 7300 series Bedienerhandbuch Seite 45

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 438
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 44
INSTALLATION
Secondary Protection
External secondary protection,
located at the trunk access area of the
System 25 cross-connect field, is required for all trunks and off-premises
lines. Refer to Table 2-B for approved trunk protectors.
FROM AC
LOAD CENTER
(TWO SEPARATELY
FUSED 15 AMP
CIRCUITS)
SINGLE
POINT
GROUND
H
GROUND
I
LOAD
CENTER
II
(GREEN)
(#14 AWG)
I
/
TO CABINET NO. 1
GROUND BAR MOUNTED ‘ GROUND BLOCK (MAX.
ON 4“ BOX (SQUARE D
LENGTH =
20 FT.)
PK9GTA OR APPROVED
EQUIVALENT)
4“ BOX (RACO 230
OR EQUIVALENT)
HUBBELL RECPTS.
( 5262 15 AMP
OR EQUIVALENT)
4“ COVER (RACO 807
OR EQUIVALENT)
APPROVED
BUILDING GROUND
(#6 AWG, COPPER)
Figure 2-9.
AC Power Distribution—Multiple Cabinet System
2-21
Seitenansicht 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 437 438

Kommentare zu diesen Handbüchern

Keine Kommentare